Muddi Tank Filling
Survey, Investigation, Design, Installation,, Testing & commissioning of Lift system
Head works consisting of Construction of Bridge cum barrage, Intake trough, Jack well cum pump house, Power supply including terminal bay,110 KV Electrical Sub Station, transmission line, Rising Main, Pressure Distribution Network, Delivery Chambers and Gravity Distribution Network), for filling up of existing 66 No’s of MI/ZP tanks in Soraba Taluk of Shivamogga district by lifting water from Varada River near Mudi village including Operation and Maintenance for a period of 5 years after successful completion of work for MUDI TANK FILLING SCHEME on Turn-Key Basis
Contractor: M/s Bagkiya Construction Pvt. Ltd. Goa along JV with M/s. Amrutha Constructions, Bangalore
Client: Karnataka Neeravari Nigam Ltd. UTP Zone, Shivamogga
Project Cost: 272.55 Crores
Project type: Irrigation Department Works (Tank filling scheme with 03 + 01 pumps of 2400HP motor each with 33kV transmission line supply and pipeline network length of 105 Kms filling 74 tanks in Soraba, Hangal & Hirekeruru taluk)
Status: Already commissioned and O & M under progress
Place: Mudi, Anavatti, Soraba taluk, Shivamogga



About the Project
The Mudi Tank Filling Scheme is a major irrigation project in Karnataka that aims to address water scarcity in the Soraba Taluk. The project involves the construction of a lift irrigation system to pump water from the Varada River and distribute it to 66 tanks in the region. This will provide a reliable water supply for agriculture, livestock, and domestic use. The project also includes a 5-year operation and maintenance contract to ensure the long-term sustainability of the system. The project is estimated to cost ₹272.55 crores and is being implemented by the Karnataka Neeravari Nigam Ltd., UTP Zone, Shivamogga.
BCPL Role
M/s Bagkiya Construction Pvt. Ltd. is the primary contractor for the Mudi Tank Filling Scheme, working in collaboration with M/s. Amrutha Constructions, Bangalore. They are responsible for the entire project, including the design, construction, installation, testing, and commissioning of the lift irrigation system. This involves building a bridge cum barrage, intake trough, jack well cum pump house, power supply infrastructure, transmission line, rising main, pressure distribution network, delivery chambers, and gravity distribution network. The project aims to fill 66 existing MI/ZP tanks in Soraba Taluk of Shivamogga district by lifting water from the Varada River near Mudi village.